On-Site Magazine

Quick assembly workbridge

By On-Site   

Construction

The Terex Bid-Well 2418 workbridge offers a 24-in. wide walkway over its 18-in. deep truss frame, allowing crew members to cross freshly laid concrete surfaces to perform tasks behind the paver. The 2418’s boom-style and all-welded construction offers a stable frame at extended widths. It is designed to snap together to eliminate the nut-and-bolt connections found on similar machines. Its interlocking bottom truss castings with pin-type top sections deliver fast assembly at the jobsite. www.terex.com

Advertisement

Stories continue below