DAILY NEWS Feb 7, 2013 11:57 PM - 0 comments

Steel integrated swimmingly for new Windsor pool

TEXT SIZE bigger text smaller text
By: EllisDon
2013-02-07

The City of Windsor is working against the clock to complete construction of a competitive pool by April, in time for the International Children's Games on Aug. 14. While massive 42-metre steel trusses will support the pool building's roof, the city is turning to modular stainless steel construction beneath to complete the main pool on schedule.

The pool is part of the city's $78-million Family Aquatic Complex, which will ultimately feature a competitive 25-by-71-metre stainless steel pool on one side of the complex, and a wave pool, water slides and additional attractions on the other. The complex is being built under a joint venture between EllisDon Corporation and Windsor's DeAngelis Construction Inc.

To read the full story click here http://www.ellisdon.com/news/-/asset_publisher/FB9x/content/steel-integrated-swimmingly-for-new-windsor-pool?redirect=http%3a%2f%2fwww.ellisdon.com%2fnews%3fp_p_id%3d101_INSTANCE_FB9x%26p_p_lifecycle%3d0%26p_p_state%3dnormal%26p_p_mode%3dview%26p_p_col_id%3dcolumn-3%26p_p_col_count%3d1

Monitor These Topics















Horizontal ruler
Horizontal Ruler

Post A Comment

Disclaimer
Note: By submitting your comments you acknowledge that On-Site Magazine has the right to reproduce, broadcast and publicize those comments or any part thereof in any manner whatsoever. Please note that due to the volume of e-mails we receive, not all comments will be published and those that are published will not be edited. However, all will be carefully read, considered and appreciated.

Your Name (this will appear with your post) *

Email Address (will not be published) *

Comments *



* mandatory fields

Receive FREE eNewsletter
from On-Site Magazine

More Info »