On-Site Magazine

McInnis Cement awards $150M cement plant contract to ThyssenKrupp Industrial Solutions

By STAFF REPORT   

Concrete Construction Infrastructure

McInnis Cement has selected ThyssenKrupp Industrial Solutions for a $150-million contract to manufacture and supply a full cement production line.

The new 6,000-mtpd clinker production plant is currently under construction on a green field site in the Port-Daniel-Gascons area of Quebec. The plant will be complete with a Polcid proprietary process control system to monitor and control all aspects of the facility and a Polad laboratory automation system to ensure product quality in every step of the process.

The main components of the plant will include: a 1,800-mtph quarry crushing plant, a raw material reclaim system consisting of a bridge reclaimer for limestone and four portal reclaimers for other additives or fuel, a Quadropol vertical roller mill for raw grinding, and a blending silo with a capacity of 10,000 mt for raw meal storage

A Polysius kiln line will consist of a five-stage, two-string Prepol As-Msc preheater, a 5.2 m x 75 m Polro rotary kiln and a Polytrack cooler with intermediate roll crusher. Cement grinding will take place in two Quadropol vertical roller mills with Sepol high-efficiency separators. The plant will also be equipped with three cement silos (with a capacity of 120,000 mt) as well as cement truck and ship loading facilities.

Advertisement

The plant is scheduled for commissioning in 2016, with full production starting later in that year.

Advertisement

Stories continue below